The program produced strong results including the stacked, flat laying quartz structures south of the
historic pit. This southern mineralisation is open at depth and dipping to the west. Significant intercepts
include:
PBRC070 – 13 metres @ 16.4 g/t Au from 9 metres
o Including 1 metre @ 195 g/t Au from 13 metres
PBRC074 – 4 metres @ 9.65 g/t Au from 36 metres
PBRC079 – 4 metres @ 2.03 g/t Au from 29 metres and
PBRC085 – 5 metres @ 27.2g/t Au from 22 metres
o Including 2 metres @ 59.6 g/t Au from 22 metres (Figures 5 and 6).
The potential for a depth extension in the zone of mineralisation south of the current Panther open pit is
highly likely with a third phase of drilling currently being planned. A Mineral Resource will be estimated
using the historical and recent data from the Beacon Phase 1 and 2 drilling programmes
- Forums
- ASX - By Stock
- BCN
- Ann: Production and Exploration Update
Ann: Production and Exploration Update, page-3
-
- There are more pages in this discussion • 57 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BCN (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $86.40M |
Open | High | Low | Value | Volume |
2.4¢ | 2.4¢ | 2.3¢ | $13.67K | 582.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 3027392 | 2.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.4¢ | 3070276 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 3027392 | 0.023 |
11 | 5452038 | 0.022 |
11 | 3414353 | 0.021 |
7 | 4139507 | 0.020 |
2 | 46368 | 0.019 |
Price($) | Vol. | No. |
---|---|---|
0.024 | 2919165 | 8 |
0.025 | 1441945 | 3 |
0.026 | 2657108 | 4 |
0.027 | 349333 | 2 |
0.028 | 2146150 | 1 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
BCN (ASX) Chart |
The Watchlist
LGP
LITTLE GREEN PHARMA LTD
Paul Long, Chief Executive Officer
Paul Long
Chief Executive Officer
SPONSORED BY The Market Online