MNS 0.00% 4.2¢ magnis energy technologies ltd

Ann: Production begins at iM3NY Battery Plant, page-722

  1. 1,010 Posts.
    lightbulb Created with Sketch. 84
    The nameplate capacity (earlier flyer) is 15,000 cells per day for a 1.8Gwh plant and we are doing 300. WTF.
    Have we got any stockpile of finished units? MNS said they were going to take the stock for Nachu. Time the board gave us a real written report on the plant.
 
watchlist Created with Sketch. Add MNS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.