at the time of the particular study yes.
it's an analysis of the entire project as an investment case.
since the study, the plant has been built etc.
so if there was a feasibility study done now asking "shall the project continue", then sunk costs would not be included in the calculation of npv.
an investor should know the definitions:
dfs, bfs, npv, sunk costs, rrr, discount rate etc.
- Forums
- ASX - By Stock
- Ann: Production commencement at Alara JV Copper-Gold Mine in Oman
at the time of the particular study yes.it's an analysis of...
-
-
- There are more pages in this discussion • 263 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AUQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.1¢ |
Change
-0.006(16.2%) |
Mkt cap ! $22.26M |
Open | High | Low | Value | Volume |
3.7¢ | 3.7¢ | 3.0¢ | $34.16K | 1.006M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 82199 | 3.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 500000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 82199 | 0.031 |
1 | 497793 | 0.030 |
1 | 25000 | 0.029 |
1 | 100099 | 0.010 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 500000 | 1 |
0.042 | 170000 | 2 |
0.043 | 140057 | 2 |
0.044 | 195452 | 2 |
0.045 | 100000 | 1 |
Last trade - 16.10pm 16/10/2024 (20 minute delay) ? |
Featured News
AUQ (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online