Erm hello, some planning would have stopped this situation occurring especially with equipment being not nearing but "past their expected life"
"The mobile fleet at Tormin (trucks, loaders, excavators and dozers) operates in harsh coastal / saltwater conditions. The majority of mobile equipment machines are past their expected life (operating hours) for this environment".
- Forums
- ASX - By Stock
- MRC
- Ann: Production Delays - Tormin Mineral Sands
Ann: Production Delays - Tormin Mineral Sands, page-13
-
-
- There are more pages in this discussion • 66 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
Add MRC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.59M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MRC (ASX) Chart |
Day chart unavailable