MRC 0.00% 2.1¢ mineral commodities ltd

Ann: Production Delays - Tormin Mineral Sands, page-65

  1. 15,751 Posts.
    lightbulb Created with Sketch. 6790
    Hi Fulang,

    You really need to read the announcements, MRC had already advised the delays with processing will be minimal.

    Potential production impacts
    While the investigation, inspection and assessment of repairs are being conducted, alternative
    water arrangements are being planned to allow production to continue with every effort being
    made to minimise the impact on volumes
    . Options being assessed include diverting seawater
    intake to the lower capacity settlement ponds, processing beach material and reprocessing of
    mined grade coarse tailings and beach / garnet material through the GSP.


    Anyway, my reading of the satellite images shows the dam had already been drained and the company has started to refill the dam.

 
watchlist Created with Sketch. Add MRC (ASX) to my watchlist
(20min delay)
Last
2.1¢
Change
0.000(0.00%)
Mkt cap ! $20.67M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
3 309463 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 26668 2
View Market Depth
Last trade - 12.59pm 27/06/2024 (20 minute delay) ?
MRC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.