They should be going straight to a one million tonne per annum plant. Why waste time on putting in another 200,000. They already have proof of concept and just need a bit higher grade.
- Forums
- ASX - By Stock
- Ann: Production Expansion Update
They should be going straight to a one million tonne per annum...
-
- There are more pages in this discussion • 165 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ELE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $24.27M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ELE (ASX) Chart |
Day chart unavailable