430,000oz's seems very achievable fo the year imo, looks to be on the light side actually. Gold recovered excluding Ravenswood = 119683 - 11046 = 108637. Extrapolate that by 4 and it is 434,548, add back the 11046 = 445,594. Also to factor in will be uplift in recoveries from 75% to 80% then 85% for the second half. Sulfide ore stockpile has risen, indicating a bottleneck at the mill/roaster, likely the roaster as they ramp up carefully post shutdown, I can see another big quarter for June from Syama and hopefully it keeps on coming $ $ $. Looks like they have padded / factored in a little disruption.
Gold Recovered is the headline figure imo, gold poured is what they got paid from refineries, with the Swiss shutdowns they must be sending it elsewhere (Rand / Perth Mint) and to keep freight costs down probably batching it a little more. Lucky they have their own runway at Syama so disruption should be minimal logistics side but I can see costs a little higher here.
Overall looks good imo!!
- Forums
- ASX - By Stock
- RSG
- Ann: Production Update March Quarter
Ann: Production Update March Quarter, page-3
-
-
- There are more pages in this discussion • 71 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RSG (ASX) to my watchlist
|
|||||
Last
61.5¢ |
Change
-0.035(5.38%) |
Mkt cap ! $1.309B |
Open | High | Low | Value | Volume |
64.0¢ | 64.8¢ | 61.0¢ | $6.159M | 9.878M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 97876 | 61.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
61.5¢ | 35050 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 97876 | 0.610 |
12 | 293619 | 0.605 |
15 | 266732 | 0.600 |
4 | 87186 | 0.595 |
9 | 420984 | 0.590 |
Price($) | Vol. | No. |
---|---|---|
0.615 | 35050 | 2 |
0.620 | 138985 | 5 |
0.625 | 137931 | 3 |
0.630 | 174108 | 4 |
0.635 | 166255 | 5 |
Last trade - 16.10pm 25/07/2024 (20 minute delay) ? |
Featured News
RSG (ASX) Chart |