PEL92 drilling to start 4 x wells expected. "The Ensign 30 rig...

  1. 256 Posts.
    PEL92 drilling to start 4 x wells expected.

    "The Ensign 30 rig is currently being moved to Callawonga-5 (PPL 220) after a short delay due to significant rain in the region. Callawonga-5 is the first well of a four well program including two development wells at the Callawonga Oilfield and two oil exploration wells in PEL 92. Interests in PEL 92/PPL 220 are Beach Petroleum Ltd (75.00%) and Cooper Energy Ltd (25.00%)."

 
watchlist Created with Sketch. Add AOE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.