Not an expert, though reading previous announcement they indicated that the wall channeling work was showing them that previous drill sections showed one grade but the wall channel were showing higher grades for further. This also showed that a fair percentage of low grade sub .8% cutoff was actually higher and would move some of that ore into the MRE of 1% or higher.
I'm expecting a decent upgrade of 20% or more or why would you bother redoing your MRE.
Cheers
- Forums
- ASX - By Stock
- EM2
- Ann: Progressing Oracle Ridge Towards Future Copper Production
Ann: Progressing Oracle Ridge Towards Future Copper Production, page-8
-
- There are more pages in this discussion • 51 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EM2 (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.2¢ |
Change
-0.001(1.89%) |
Mkt cap ! $20.42M |
Open | High | Low | Value | Volume |
5.3¢ | 5.3¢ | 5.2¢ | $2.873K | 55.24K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 3500 | 5.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.7¢ | 90000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 3500 | 0.052 |
2 | 350000 | 0.051 |
6 | 230001 | 0.050 |
3 | 36376 | 0.048 |
2 | 320000 | 0.047 |
Price($) | Vol. | No. |
---|---|---|
0.057 | 90000 | 1 |
0.059 | 14000 | 1 |
0.060 | 149210 | 3 |
0.062 | 2487 | 1 |
0.066 | 12000 | 1 |
Last trade - 10.35am 05/07/2024 (20 minute delay) ? |
Featured News
EM2 (ASX) Chart |