When it's running at maximum capacity, I reckon there might be 1,000 tonne of raw material on site... but I think that's a fair way down the track. We are looking at production 150T per month in the short term, so I'd hazard a guess that there's not even 100T of raw material on site yet.
I will see what I can confirm and report back if possible.
The bags in the photo are probably 1T bags?? .... and there's definitely not a thousand of them on site. Hopefully one day soon there will be
I could be wrong...
- Forums
- ASX - By Stock
- Ann: Progressing to full production at Expandable Graphite site
When it's running at maximum capacity, I reckon there might be...
Featured News
Add EVG (ASX) to my watchlist
|
|||||
Last
2.3¢ |
Change
0.002(9.52%) |
Mkt cap ! $7.980M |
Open | High | Low | Value | Volume |
2.2¢ | 2.3¢ | 2.2¢ | $3.647K | 160.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 91563 | 2.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.4¢ | 150000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 91563 | 0.023 |
1 | 500000 | 0.022 |
4 | 427382 | 0.021 |
3 | 124600 | 0.020 |
1 | 196439 | 0.019 |
Price($) | Vol. | No. |
---|---|---|
0.024 | 150000 | 1 |
0.025 | 200000 | 1 |
0.026 | 38498 | 1 |
0.029 | 42000 | 1 |
0.030 | 15392 | 1 |
Last trade - 15.50pm 30/07/2024 (20 minute delay) ? |
Featured News
EVG (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online