STX 2.78% 18.5¢ strike energy limited

Ann: Project Haber Update, page-46

  1. 6,249 Posts.
    lightbulb Created with Sketch. 311
    NWE having problems with getting the drilling done at Lockyer Deep.
    Tooter can you tell me who is at fault .
    If this happened at one of our sites it would have been STX at fault.
    NWE ann "Announcement to ASX 5 August 2021 LOCKYER DEEP-1 OPERATIONAL UPDATE Further to the recent operational update as provided in the Company's Quarterly Activities Report of 30 July 2021, Perth Basin oil and gas exploration company Norwest Energy NL (“Norwest” or the “Company” provides the following update regarding operations at the Lockyer Deep-1 conventional gas exploration well. Configuration and testing of the blowout preventer (BOP) by rig contractor Ensign has not achieved the required outcome for drilling to proceed. Ensign has sourced replacement parts which are expected to arrive on site within the next five days, including a replacement BOP as a contingency measure. Once the BOP issue is resolved drilling operations will resume, with the Company's next scheduled operational update to now occur when drilling has recommenced in the 12-1/4" hole from the surface casing shoe at 1,205 metres depth (MDRT)."
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
18.5¢
Change
0.005(2.78%)
Mkt cap ! $530.0M
Open High Low Value Volume
18.5¢ 19.0¢ 18.0¢ $1.303M 7.063M

Buyers (Bids)

No. Vol. Price($)
4 347828 18.5¢
 

Sellers (Offers)

Price($) Vol. No.
19.0¢ 1205075 19
View Market Depth
Last trade - 16.10pm 12/09/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.