88E 25.0% 0.3¢ 88 energy limited

Ann: Project Icewine Operations Update, page-123

  1. 2,776 Posts.
    lightbulb Created with Sketch. 602
    From the DW announcement
    "The well was stimulated in two stages over a gross 128 foot vertical interval in the HRZ shale formation, from 10,957-11,085ft TVD, using a slickwater treatment comprising 27,837 barrels of fluid and 1,034,838 pounds of proppant."

    From the above article on Slickwater.

    "Advantages:
    • High retained conductivity, due to no filtercake present.
    • Reduced sensitivity to salinity and contaminants in mix-water.
    • Reduced number of fluid additives required for slickwater fracturing fluid.
    Disadvantages:
    • Larger volumes of water often required for fracture design (compared to "gelleg" fracturing fluids).
    • Larger horsepower requirement (to maintain high pump rates, 60-110bpm).
    • Limited fracture-width (due to low maximum concentration proppant in low viscosity).
    • Reduced %-flowback-water recovery (due to imbibement of fracturing fluid in complex fracture network far from wellbore).
    • Limitation to fine-mesh propping agents (due to reduced ability of nonviscous fluids in transport of large proppants)."
    Might explain some of the delayed flowback and subsequent imbibition.
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.001(25.0%)
Mkt cap ! $57.78M
Open High Low Value Volume
0.3¢ 0.3¢ 0.2¢ $1.614K 596.0K

Buyers (Bids)

No. Vol. Price($)
192 304427507 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 647749525 211
View Market Depth
Last trade - 10.13am 18/07/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.