KPO 0.00% 0.3¢ kalina power limited

There are two key updates expected in June. One is the filing of...

  1. 7,400 Posts.
    lightbulb Created with Sketch. 360
    There are two key updates expected in June.

    One is the filing of the permit application with the Alberta Utility Commission for approval to construct and operate the first project at Saddle Hills

    The other is the response by the Alberta Utility Commission on the Distribution Generator Credits scheme.

    Favourable updates on both of these should increase market confidence in the lead up to FNTP.
 
watchlist Created with Sketch. Add KPO (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $7.459M
Open High Low Value Volume
0.3¢ 0.3¢ 0.3¢ $41.20K 13.80M

Buyers (Bids)

No. Vol. Price($)
2 2663179 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 10012741 12
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
KPO (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.