Interestingly the Saddle Hills site is adjacent to Cnrl Progress Gas Plant. So you would have to bet that there is lots of infrastructure already in place.
The red outline is my poor attempt to highlight where KPO's site is. The site is 45 minutes drive from Spirit River and 90 minutes drive from Grande Prairie.
- Forums
- ASX - By Stock
- Ann: Project Update on KALiNA Energy Centre - Saddle Hills
Interestingly the Saddle Hills site is adjacent to Cnrl Progress...
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KPO (ASX) to my watchlist
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.459M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 17379997 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 25621397 | 18 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 17379997 | 0.003 |
12 | 14531167 | 0.002 |
5 | 7395000 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 25621397 | 18 |
0.005 | 6243235 | 5 |
0.006 | 99007 | 1 |
0.007 | 2043125 | 3 |
0.008 | 3100000 | 2 |
Last trade - 16.12pm 17/07/2024 (20 minute delay) ? |
Featured News
KPO (ASX) Chart |
Day chart unavailable