I believe the first stage is complete, a lengthening of a passing loop so that two export length trains could cross halfway to lephalale, this would effectively double the existing tonnage to around 3 mtpa. The next stage would to be put in a second passing loop, I believe the origianl earthworks from the 80's made allowance for this and is therefore tracklaying work only with some signalling.