Ann: Project Updates (other than Permian Basin) , page-2

  1. 357 Posts.
    lightbulb Created with Sketch. 3
    re: Ann: GGP: Project Updates (other than Per... Does this mean that they're looking at two different drill sites for the mentioned FP operations

    One for the side drill and the other for the shallow oil target?

    The side drill site has been readied for drill operations and the shallow target site needs time due to the location, ie wetland.
 
watchlist Created with Sketch. Add GGP (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.