AUZ 6.25% 0.8¢ australian mines limited

Last page (6) interesting time line. Following the positive...

  1. 2,466 Posts.
    lightbulb Created with Sketch. 294
    Last page (6) interesting time line.

    Following the positive results from this Study (Stage 1), Australian Mines intends on undertaking further work as part of the commercialisation process, including: • Stage 2 (Pre-Feasibility Study) – over the next 3-6 months, which will focus on metal recovery from the DES formulations and front-end optimisations, • Stage 3 (Full Feasibility and Pilot Design) – over a 12-month period, and • Stage 4 (Pilot Plant) – over a 3–6-month period of operation, as well as a construction period.
 
watchlist Created with Sketch. Add AUZ (ASX) to my watchlist
(20min delay)
Last
0.8¢
Change
-0.001(6.25%)
Mkt cap ! $10.48M
Open High Low Value Volume
0.7¢ 0.8¢ 0.7¢ $7.069K 988.8K

Buyers (Bids)

No. Vol. Price($)
40 11334814 0.7¢
 

Sellers (Offers)

Price($) Vol. No.
0.8¢ 981944 12
View Market Depth
Last trade - 15.38pm 28/06/2024 (20 minute delay) ?
AUZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.