Pbnewby
One needs to get a better handle on how the 40/60 deal would stack up in respect of ore sourced from tenements not forming part of the 40/60 deal versus, ie wholly owned by NST. If they were to only process ore from NST owned tenements then what would be the share of profits to TAM? I think there would be some profits for TAM as a result of their 40% ownership of the plant, but that it would be a lot less than 40%.
Another issue is possible plant optimisation to suit NST's view of the economics of the project. I can not recall what cost capital sharing there would be if NST wants to operate a plant from the getgo that has a higher capacity than available from just refurbishing the existing plant.
loki
- Forums
- ASX - By Stock
- Ann: Proposed Sale of Western Tanami Project
Pbnewby One needs to get a better handle on how the 40/60 deal...
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TAM (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $38.77M |
Open | High | Low | Value | Volume |
3.2¢ | 3.3¢ | 3.2¢ | $17.84K | 547.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 240738 | 3.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.3¢ | 77177 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 240738 | 0.032 |
5 | 697266 | 0.031 |
2 | 348000 | 0.030 |
4 | 547413 | 0.029 |
3 | 350000 | 0.028 |
Price($) | Vol. | No. |
---|---|---|
0.033 | 77177 | 1 |
0.035 | 491178 | 2 |
0.037 | 905405 | 2 |
0.038 | 200000 | 1 |
0.039 | 200000 | 1 |
Last trade - 16.10pm 01/11/2024 (20 minute delay) ? |
Featured News
TAM (ASX) Chart |