AW1 3.23% 15.0¢ american west metals limited

Yes, was on Roy Hill before mine camp was constructed, 2011to...

  1. 1,966 Posts.
    lightbulb Created with Sketch. 474
    Yes, was on Roy Hill before mine camp was constructed, 2011to 2013. Worked for a consultant (Coffey Mining) to Samsung CT and NRW.

    Mainly involved with design of ROM and 356km rail mine to port.


    Having been involved with many quarry/borrow pits I can tell you a drill blast operation with a couple of dumper trucks, 2/3 excavators, 2 jaw crushers and 1 or 2 Ote sorters we could easily produce 2000+t per day of raw material. What I am not familiar with is the thru put of the Steinhert sorters. Size matters, larger size is more cost etc but 3000t per week of 25% DSO is very good coin for a start up operation. Having said that we could operate all those machine with an 8 to 10 man crew per shift. Minimun 2 x 10 hour shift per day.

    Once again, referring to old mate and his infrastructure comment, a camp for 40+ staff could get us producing 20 to 30,000t of raw DSO in a 4 to 5 month season. Daylight 24/7 Canadian summer
    Last edited by hotuna: 26/02/24
 
watchlist Created with Sketch. Add AW1 (ASX) to my watchlist
(20min delay)
Last
15.0¢
Change
-0.005(3.23%)
Mkt cap ! $77.65M
Open High Low Value Volume
15.0¢ 15.5¢ 15.0¢ $88.96K 584.5K

Buyers (Bids)

No. Vol. Price($)
2 235024 15.0¢
 

Sellers (Offers)

Price($) Vol. No.
15.5¢ 75094 3
View Market Depth
Last trade - 16.10pm 06/05/2024 (20 minute delay) ?
Last
15.5¢
  Change
-0.005 ( 3.33 %)
Open High Low Volume
15.3¢ 15.5¢ 15.0¢ 629473
Last updated 15.48pm 06/05/2024 ?
AW1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.