If we can extrapolate (and I believe we can) when they drilled Crown-1 next door they ran into the exact same problems and also had to side track their well. It was caused from high pressure gas in the layers of shale above the sands. And it gave them fits also even in the side track well. Almost identical scenario. If Swanny's friends are right (and I believe they are) that same structure extends across into where Proteus is drilling. Which means they are about to drill into a thick layer of beautiful pourus sand packed full of high pressure gas! It may be slow going as they work their way through this area but they will get there. The 4800-4900 area is where things should get interesting. Looking very very good.
- Forums
- ASX - By Stock
- Ann: Proteus-1 Progress Report No 7
If we can extrapolate (and I believe we can) when they drilled...
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.84 |
Change
0.000(0.00%) |
Mkt cap ! $1.470B |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 20785 | $1.93 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.75 | 3302 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 20785 | 1.925 |
1 | 2583 | 1.890 |
1 | 726 | 1.875 |
1 | 100 | 1.840 |
1 | 8650 | 1.835 |
Price($) | Vol. | No. |
---|---|---|
1.745 | 824 | 2 |
1.750 | 3640 | 2 |
1.770 | 70 | 2 |
1.785 | 6722 | 2 |
1.810 | 5774 | 3 |
Last trade - 09.59am 30/07/2024 (20 minute delay) ? |
Featured News
KAR (ASX) Chart |
Day chart unavailable
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online