Thats all speculation. If twiggy isnt there, its start from scratch.
But the question would be does twiggy need PRL or does PRL need twiggy.
I think PRL needs twiggy therefore you are in a weak negotiating stance. Same as Total - they had all the power. Having a glorified landparcel with no actual feasibility or financial summary besides some big vision doesnt add any value to a business.
- Forums
- ASX - By Stock
- Ann: Province to progress HyEnergy Project without Total Eren
Thats all speculation. If twiggy isnt there, its start from...
-
-
- There are more pages in this discussion • 51 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
Add PRL (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $48.44M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
PRL (ASX) Chart |
Day chart unavailable