80,000 scm x 37 euro cents x 63% share = $11M AUD per year in cashflow which would be over $10M FCF.
80,000 is the gross production rate of the PM1 asset. If that lasts during the gross lifespan of 13.4 BCF it will last 13 years.
PVE is effectively trading on a 4.5x NPAT with none of the other project upside or asset realisation factored in. No wonder the directors are loading up!
- Forums
- ASX - By Stock
- Ann: PVE - Podere Maiar-1 Slick Line Operations Results
80,000 scm x 37 euro cents x 63% share = $11M AUD per year in...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PVE (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $40.56M |
Open | High | Low | Value | Volume |
3.5¢ | 3.5¢ | 3.5¢ | $0 | 10 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 410159 | 3.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.5¢ | 167989 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 410159 | 0.033 |
1 | 40000 | 0.032 |
1 | 81843 | 0.030 |
1 | 34200 | 0.029 |
1 | 500000 | 0.024 |
Price($) | Vol. | No. |
---|---|---|
0.035 | 167989 | 2 |
0.036 | 200000 | 1 |
0.041 | 10000 | 1 |
0.047 | 35000 | 1 |
0.048 | 34651 | 1 |
Last trade - 15.19pm 30/09/2024 (20 minute delay) ? |
Featured News
PVE (ASX) Chart |