QPM 15.6% 3.7¢ queensland pacific metals limited

Ann: QPM to Focus on Gas and Energy Growth, page-192

  1. 3,015 Posts.
    lightbulb Created with Sketch. 669
    There wont be any LNG plants. A two train LNG plant on Curtis Island takes around 1500TJ+ a day I think...

    I'm talking about MicroLNG. Similar to Condamine LNG or the other small one down in Tasmania.

    I'd say for design, engineering, approvals and final commissioning...quite a while. Probably 6 month construction time. At a fair price too...


    Last edited by piwi33: 01/05/24
 
watchlist Created with Sketch. Add QPM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.