QPM 0.00% 3.3¢ queensland pacific metals limited

There wont be any LNG plants. A two train LNG plant on Curtis...

  1. 2,607 Posts.
    lightbulb Created with Sketch. 595
    There wont be any LNG plants. A two train LNG plant on Curtis Island takes around 1500TJ+ a day I think...

    I'm talking about MicroLNG. Similar to Condamine LNG or the other small one down in Tasmania.

    I'd say for design, engineering, approvals and final commissioning...quite a while. Probably 6 month construction time. At a fair price too...


    Last edited by piwi33: 01/05/24
 
watchlist Created with Sketch. Add QPM (ASX) to my watchlist
(20min delay)
Last
3.3¢
Change
0.000(0.00%)
Mkt cap ! $83.18M
Open High Low Value Volume
3.3¢ 3.3¢ 3.1¢ $95.18K 3.003M

Buyers (Bids)

No. Vol. Price($)
1 29406 3.2¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 292084 3
View Market Depth
Last trade - 16.10pm 14/06/2024 (20 minute delay) ?
Last
3.1¢
  Change
0.000 ( 6.06 %)
Open High Low Volume
3.2¢ 3.3¢ 3.1¢ 797696
Last updated 15.59pm 14/06/2024 ?
QPM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.