MEL 16.7% 0.5¢ metgasco ltd

Hi Mitchdon,If Operator is unable to get Vali-2 back online, in...

  1. 1,578 Posts.
    lightbulb Created with Sketch. 3803
    Hi Mitchdon,
    If Operator is unable to get Vali-2 back online, in my view that does not translate into a reserves downgrade, as long as the JVP have a plan to drill another well proximal to Vali-2. In my view, if Vali-2 and/or Vali-3 were back online by now, there would have been an announcement, so all we can conclude is that they are still attempting to get these wells producing gas. I do not believe that the appraisal through production strategy has caused any uncertainty. In my view, the unplanned Downstream maintenance was responsible for the issues at Vali-2 and Vali-3. Fortunately, Vali1ST1 has not been impacted.....yet....https://hotcopper.com.au/data/attachments/5520/5520213-f86a71e88975eee82cb36314f9788d6d.jpg


    Finally, the JVP are already, and very much focussed on Odin first gas. I don't think they need a workover rig at Odin-1 to achieve first gas which would be a plus. Vali-2 and Vali-3 are as equally important in the JVP focus.

    Kind regards OldGeo
 
watchlist Created with Sketch. Add MEL (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
-0.001(16.7%)
Mkt cap ! $6.244M
Open High Low Value Volume
0.6¢ 0.6¢ 0.5¢ $14.96K 2.992M

Buyers (Bids)

No. Vol. Price($)
12 13713050 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 51000 1
View Market Depth
Last trade - 15.48pm 26/06/2024 (20 minute delay) ?
MEL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.