Pretty sensible set of results. Production in line with guidance (just below mid-point for CY2020) - even though the plant utilisation continued at 82%. AISC dropped (though only because of increased volume).
I think 2021 will be a proving year for GOR - i.e. can they get the plant ute up, can they see a systemic drop in AISC.
Re. exploration, I think Gilmore is beginning to look interesting. Potential addition to the NW for the existing MR, and then the emergence of the potential new shoot (with some reasonable initial results). It feels like Gilmore has been just "hanging around" for some time - perhaps 2021 is the year where GOR makes a move with it and determines its viability - either as a standalone (would need significant addition to the scale), or as a distant (55km) extension to Gruyere.
- Forums
- ASX - By Stock
- Ann: Quarterly Activities and Cash Flow Report - Dec 2020
Pretty sensible set of results. Production in line with guidance...
-
- There are more pages in this discussion • 67 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GOR (ASX) to my watchlist
|
|||||
Last
$1.73 |
Change
0.060(3.59%) |
Mkt cap ! $1.874B |
Open | High | Low | Value | Volume |
$1.75 | $1.78 | $1.71 | $25.98M | 15.00M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 40541 | $1.73 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.73 | 46799 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 40541 | 1.725 |
5 | 410221 | 1.720 |
3 | 47204 | 1.715 |
6 | 83186 | 1.710 |
7 | 222425 | 1.705 |
Price($) | Vol. | No. |
---|---|---|
1.730 | 8006 | 2 |
1.735 | 43764 | 4 |
1.740 | 32595 | 4 |
1.745 | 29096 | 3 |
1.750 | 80150 | 10 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
GOR (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online