Am I reading this correctly?
It may sound dumb so please correct me if I am wrong..?
"A total of 29 RC holes were drilled for a total of 3,903m during the quarter.RC drilling was focused solely on Kat Gap with work concentrating on the deeper drilling of the potential down plunge of high-grade gold mineralisation plus shallow RC drilling out in the granite. The company is still waiting on infill drilling results undertaken in September. Results are expectedsometime in January 2021."
issued 29th Jan 2021
Add to My Watchlist
What is My Watchlist?