PRX 0.00% 0.3¢ prodigy gold nl

1. If I am reading correctly it appears IMO ABU will walk away...

  1. 1,327 Posts.
    lightbulb Created with Sketch. 9
    1. If I am reading correctly it appears IMO ABU will walk away from Coyote.
    "All leased infrastructure & accommodation will be demobilised" in April 2016.

    2. Also potential for return to mining;
    "There is scope to revisit Old Pirate & potentially develop a more extensive & financially robust mining operation if a larger scale, lower cost processing option can be established or otherwise accessed"

    3. Valuable knowledge from the experience was gained;
    "Significant technical data was obtained from mining at Old Pirate to an improved understanding of mineralisation & geology in this area"

    Now lets analyse these points;
    1A. In the 2013 Ann report ABU wrote about 7 pages on how they would use the on-site gravity feed processing plant after the success of stage 1 mining. Yet a complete backflip with half pike and a twist came after PCR came on board in 2014; the Coyote TAM deal was signed.

    2A. Why wasn't an extensive & robust feasibility study conducted in the 1st place before Coyote deal was signed with TAM.

    3A. Valuable knowledge was gained from the experience; this isn't a uni course in mining 101; also stage 1 mining (Ha Ha Ha) realised results of 15.8 g/t (Ha Ha Ha); the understanding of the geology was via trial mining + extensive drilling.

    Conclusions
    The deal with TAM & Coyote was not reported till after the event in 2014; yet ABU reported a mining plan in the 2013 Ann report (7 pages of it); you can't report one thing via ASX then go do another which was not reported till after the event; you can't blind side shareholders like that.

    Stage 1 mining in 2013 (Ha Ha Ha) was a joke; lets face it the results from stage 1 do not correlate with stage 2; yet the company has not commented on this discrepancy. The valuable knowledge gained from stage 2 was at the expense of shareholders yet stage 1 mining was designed to mitigate risk for stage 2. Stage 1 mining results were obviuosly flawed!

    It is now woefully apparent the the whole BOD was incompetent; why they are hanging around is beyond me. And Dr Lambert; with all your experience your report card in regards to ABU is IMO woeful.
    Last edited by Holdonman: 30/01/16
 
watchlist Created with Sketch. Add PRX (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $5.294M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
25 11646362 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 21124699 19
View Market Depth
Last trade - 11.42am 05/07/2024 (20 minute delay) ?
PRX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.