Ore mined for the quarter was 1,069,056 million tonnes and the average heavy mineral (HM) grade of ore mined
was 1.02%. Total HMC production for the quarter was 10,119 tonnes. Sand tailings was deposited into the
temporary off path tailings storage facility.
92.8% recovery at the wcp. a bit of work to do there yet.
Commissioning the msp in february....... in the mid west of W.A..... temps in the mid to high 30's outside the building.
kcf
- Forums
- ASX - By Stock
- STA
- Ann: Quarterly Activities and Cashflow Report
Ann: Quarterly Activities and Cashflow Report, page-4
-
- There are more pages in this discussion • 43 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online