Pilot plant to Demonstration plant.
Modification of the pilot plant involved larger volume leach tanks to
maximize leach filter capacity. The filters were also equipped with
redesigned plates and a revised wash system plus other downstream
modifications. From 15 to 32kg/h.
These modifications will be incorporated in P1 design.
I am thinking that the P1 could possibly be spitting out figures more
closer than that of a P2 and may explain some delays in reporting.
The guys and gals are definitely not sitting around twiddling their thumbs.
GLAH and just an opinion.
- Forums
- ASX - By Stock
- Ann: Quarterly Activities/Appendix 5B Cash Flow Report
Pilot plant to Demonstration plant.Modification of the pilot...
-
- There are more pages in this discussion • 40 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LPD (ASX) to my watchlist
|
|||||
Last
0.3¢ |
Change
0.001(25.0%) |
Mkt cap ! $21.47M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.2¢ | $4.865K | 1.756M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
160 | 141041372 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 72515664 | 49 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
159 | 141031472 | 0.002 |
40 | 175629251 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 42515664 | 48 |
0.004 | 34582315 | 38 |
0.005 | 10846545 | 10 |
0.006 | 8096154 | 14 |
0.007 | 3801436 | 5 |
Last trade - 15.41pm 26/07/2024 (20 minute delay) ? |
Featured News
LPD (ASX) Chart |