VRX 0.00% 3.1¢ vrx silica limited

The Muchea project will require a separate ESD. The timetable...

  1. 990 Posts.
    lightbulb Created with Sketch. 99
    The Muchea project will require a separate ESD. The timetable for that depends on the EPA. It will be a 'controlled action' and it will be more challenging than Arrowsmith. There won't be a 'confirmed' timetable until the ESD is approved. Glass manufacturing promoted strongly with Muchea which is a huge positive.
 
watchlist Created with Sketch. Add VRX (ASX) to my watchlist
(20min delay)
Last
3.1¢
Change
0.000(0.00%)
Mkt cap ! $19.47M
Open High Low Value Volume
3.1¢ 3.1¢ 3.1¢ $775 25K

Buyers (Bids)

No. Vol. Price($)
7 437166 3.0¢
 

Sellers (Offers)

Price($) Vol. No.
3.1¢ 25000 1
View Market Depth
Last trade - 11.32am 16/08/2024 (20 minute delay) ?
VRX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.