GIB 11.1% 4.0¢ gibb river diamonds limited

Ann: Quarterly Activities/Appendix 5B Cash Flow Report, page-2

  1. 778 Posts.
    lightbulb Created with Sketch. 86
    1.1 Phase 7 Drilling ProgramDuring the March quarter, the Phase 7 RC drill program at the Edjudina Gold Project wasconducted. This program took place from 2 to 10 March 2022 with a total of 15 RC holes drilledfor 1,992 metres.There were no accidents or lost time incidents during this program.The drilling program tested a number of targets at the Neta and Triumph Prospects, the resultsof which will be reported in the first week of May 2022.

    Not long now.
 
watchlist Created with Sketch. Add GIB (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.