Obviously the Sockovac issue has hampered this stock in recent times but heaps of news pending plus a fair bit of drilling coming up in this quarter. Been buying the options.
Cajnice Project
• Gramusovici Prospect: Six holes completed to date. Hole CADD006 has
intersected 4.7m with sulphides. All assay results pending
RDK Prospect: second hole complete, intersecting 1m wide massive sulphide
from 74m down-hole depth (NE of the historic mine) - all assay results
pending - first results expected late-July
Zekil-Erak prospect: eight-trench program progressing well, first trench
excavated complete - all assay results pending
• Surface rock chips returned up to 6.94 g/t gold, 183 g/t silver, 4.11% copper
and 1.33% antimony
Obviously the Sockovac issue has hampered this stock in recent...
Add to My Watchlist
What is My Watchlist?