The only information being presented on grade is some comments in research forecasts. It a safe bet that a lot of the current product isn't getting to the 32-33% range or E25 would be putting it in their quarterlies that they have achieved PFS grades and are working on volumes.
I'm not sure if the original designs had a gravity concentrator system like DMS, but once they achieved good test results with their flowsheet of Dig, Crush, Wash, Size grade & Optical sort (ref 23 Mar 2020), they when with that. It would appear the test sample was washed to a much cleaner state than the log washer does. This means that within the test work the optical sorter didn't have the clay distortions that can cause a misread.
I'm not sure if its a typo, but my understanding is that DMS is a sub-category of a gravity concentrator circuit. DMS uses gravity to select different material densities but does this by having a liquid that is a lot heavier than water. Where water works to separate pumice from other rocks, with a heavier liquid you can select different densities. If for example all the material you wanted was 3.0x heavier than water then if you dialed in a liquid with this density anything lighter would float and be waste. You could also max the range to eliminate other heavier materials (and if really lucky with the ore, get a useful byproduct). If using DMS its unlikely you would need to use a 2nd gravity concentrator system.
DMS won't be fooled by traces of clay on otherwise quality manganese ore, hence its not surprising that it generates good beneficiation results.
- Forums
- ASX - By Stock
- Ann: Quarterly Activities/Appendix 5B Cash Flow Report
The only information being presented on grade is some comments...
-
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add E25 (ASX) to my watchlist
(20min delay)
|
|||||
Last
28.0¢ |
Change
0.015(5.66%) |
Mkt cap ! $61.57M |
Open | High | Low | Value | Volume |
26.5¢ | 28.0¢ | 26.5¢ | $19.53K | 73.57K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 19230 | 26.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
28.5¢ | 41666 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 19230 | 0.260 |
4 | 76423 | 0.255 |
2 | 140000 | 0.250 |
1 | 40000 | 0.245 |
2 | 52042 | 0.235 |
Price($) | Vol. | No. |
---|---|---|
0.285 | 41666 | 1 |
0.295 | 1694 | 1 |
0.300 | 34203 | 2 |
0.310 | 156513 | 4 |
0.315 | 147458 | 1 |
Last trade - 16.10pm 11/11/2024 (20 minute delay) ? |
Featured News
E25 (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, MD & CEO
Charles Armstrong
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online