HCH 1.28% 77.0¢ hot chili limited

18 months. If everything was ready to go. Another 18 months to...

  1. 6,971 Posts.
    lightbulb Created with Sketch. 994
    18 months. If everything was ready to go. Another 18 months to build the mine. There's still enough float in time to get it done both water and copper production by 2028-29. It would be head down bum up and go for it. With little time for excuses. If thete was a time to shine? This is it.
 
watchlist Created with Sketch. Add HCH (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.