BLZ blaze minerals limited

On 19 May 2021 Blaze announced the completion of a Gradient...

  1. 2,418 Posts.
    lightbulb Created with Sketch. 79
    On 19 May 2021 Blaze announced the completion of a Gradient Array IP survey over the western half
    of the Eastern Core Complex that had detected the presence of possible disseminated sulphide
    accumulations. The results showed a dyke-parallel moderately chargeable zone associated with a
    low-magnetic phase of the intrusion (Figure 4).

    This zone is interpreted to represent disseminated sulphide within a non-magnetic pyroxenite. Blaze
    interprets the two point-source chargeability anomalies as representing localised zones of increased
    sulphide abundance. The Company has lodged a Programme of Works and has scheduled a heritage
    survey in preparation for drilling two ‘pipe’ targets named Huginn and Munnin. Huginn is
    approximately 200m wide and Munnin is approximately 300m x 200m in dimension.

    The targets literally have the name "Munnin". As in - to the moon; only if they start drilling.
    POW is encouraging so hopefully it should happen within the next 6 months.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $7.113M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $560 140K

Buyers (Bids)

No. Vol. Price($)
14 14004540 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 14672510 7
View Market Depth
Last trade - 09.59am 01/08/2025 (20 minute delay) ?
BLZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.