And ya can't drill straight beyond 20m in any ground irrespective of using chrome couplers, 105mm rods or whatever and guess what? That implies a back to floor sublevel (or level) interval of about 15m at a production rate limited by ventilation capacity, which ties in nicely with a 15m limit on ladder slot or vent rises, beyind which the Mines Inspector (G'day, Cam!) gets shirty. There y'are, basic mining engineering, all done for ya's.
- Forums
- ASX - By Stock
- Ann: Quarterly Activities Report and Appendix 5B
And ya can't drill straight beyond 20m in any ground...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTO (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $24M |
Open | High | Low | Value | Volume |
0.8¢ | 0.8¢ | 0.8¢ | $5.144K | 643.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 1727412 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 5812229 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 1727412 | 0.007 |
7 | 5084626 | 0.006 |
10 | 3640000 | 0.005 |
19 | 11937132 | 0.004 |
10 | 3670437 | 0.003 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 5812229 | 8 |
0.009 | 737558 | 4 |
0.010 | 19730160 | 6 |
0.012 | 10450000 | 7 |
0.013 | 90086 | 1 |
Last trade - 10.02am 21/05/2024 (20 minute delay) ? |
|
|||||
Last
0.8¢ |
  |
Change
0.000 ( 14.3 %) |
|||
Open | High | Low | Volume | ||
0.8¢ | 0.8¢ | 0.8¢ | 11200 | ||
Last updated 10.04am 21/05/2024 ? |
Featured News
CTO (ASX) Chart |