ENR encounter resources limited

Sentinel 1 August and DDH drilling mentioned in...

  1. 3,410 Posts.
    lightbulb Created with Sketch. 9754
    Sentinel 1 August and DDH drilling mentioned in quarterly

    Sentinel
    The "stratigraphic" fence of drilling at McIlroy was extended a further 1.9 Kms to the north. 6 sites at a nominal 320m spacing.
    No other evidence of aircore activity in cloud free areas - Emily visible but most of Luni and Green/Joyce are not.
    What I assumed to be the DD camp is no longer visible. Probably because the DD rig is soon to be replaced with an RC one.

    Link to DYOR - Note there is a tech issue with coverage at Luni/Green.

    McIlroy
    Gravity
    https://hotcopper.com.au/data/attachments/6355/6355127-fa21ef6bfa5c579b52f1d178c83cc79f.jpg
    Testing the gravity low and going into the margins. Will give an idea of what lithologies underlie the fence if penetration was sufficient.
    37 holes over 10+- days. 31 sites "appearing" in previous 5 days with 6 in the last 5. Which were visited, and when, is a moot point if all have been drilled.
    Spacing 160m in south and 320m in north.

    Magnetics
    https://hotcopper.com.au/data/attachments/6355/6355156-eaffcd2efdcb8ab45e6e434f91162415.jpg
    Magnetics.
    The gravity low is partially reflected in the magnetics which have a little more texture. Marginal features show some linearity not readily visible in gravity.
    The 160m spaced drilling was probably designed to test extensions and possible splays of the Elephant Island Fault. Further north are the lows of mag/grav plus some interesting magnetic features.

    https://hotcopper.com.au/data/attachments/6355/6355233-ca4f06d5e83c4390e807e53b676eb982.jpg
    Couldn't get this image into QGIS accurately enough so the red line is schematic for the fence.

    =====================
    EIF Stromness drilling.
    https://hotcopper.com.au/data/attachments/6355/6355245-9f3e152aa025945c73782bdee731d156.jpg
    The quarterly says two holes drilled for 1117m. Sequence not clear but suspect the north hole drilled first. No idea of the length or detail of each hole so shown as 50/50 split drilling north at -60 degrees. There will be some deviation.


    Updated schematic image - highly interpretive for Hurley
    https://hotcopper.com.au/data/attachments/6355/6355313-ab46e1b36824839698cf97d7d623ad35.jpg


    Schematic section using interpreted locations and projections of carbonatite from the above plan.
    DYOR as so many assumptions involved in developing this.
    https://hotcopper.com.au/data/attachments/6355/6355311-1ef08479f5726cb26f908a44287d1655.jpg



 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
22.0¢
Change
-0.010(4.35%)
Mkt cap ! $109.7M
Open High Low Value Volume
22.0¢ 22.0¢ 22.0¢ $3.384K 15.38K

Buyers (Bids)

No. Vol. Price($)
2 11831 22.0¢
 

Sellers (Offers)

Price($) Vol. No.
23.0¢ 47150 2
View Market Depth
Last trade - 14.03pm 16/06/2025 (20 minute delay) ?
ENR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.