M8S 0.00% 0.9¢ m8 sustainable limited

Gingin not expected be completed until the last qtr of 2022 FY....

  1. 167 Posts.
    lightbulb Created with Sketch. 14
    Gingin not expected be completed until the last qtr of 2022 FY. Approx $4mil left for funding. Still paying 14% on the borrowing. Losing faith in the board and MD. Very disappointing report.
 
watchlist Created with Sketch. Add M8S (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.