POS 16.7% 0.4¢ poseidon nickel limited

Ann: Quarterly Activities Report - June 2022, page-3

  1. 5,453 Posts.
    lightbulb Created with Sketch. 560
    ."The Company has requested GR Engineering Services (GRES) to investigate increasing the throughput of the concentrator to 2.2Mtpa (nameplate) concurrently with 1.1Mtpa process plant and infrastructure study. This will include capex and opex estimates to produce approximately 100ktpa of concentrate to feed into a POX circuit to produce a mixed hydroxide precipitate (MHP)."

    And......

    " If PBT’s pCAM hub is constructed, it could be of great benefit to Poseidon by maximising margins on concentrates supplied to the refinery as well as potentially being able to treat a “rougher” nickel concentrate from Black Swan produced by blending both serpentinite and talc-carbonate ores. Discussions with PBT to supply concentrate from Black Swan as a base load feed for their proposed Kalgoorlie pCAM refinery project remained ongoing during the quarter."

    Are these 2 possible outcomes independent ie the POX/MHP would be a stand alone POS project?
 
watchlist Created with Sketch. Add POS (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.001(16.7%)
Mkt cap ! $14.63M
Open High Low Value Volume
0.3¢ 0.4¢ 0.3¢ $13.16K 4.232M

Buyers (Bids)

No. Vol. Price($)
109 61131188 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 56766350 28
View Market Depth
Last trade - 15.55pm 10/09/2024 (20 minute delay) ?
POS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.