DM production grade of only 6.5 g/t due to poorer grades in the northern mineralised zones (levels 17-19) and necessary mining through low grade areas on levels 25-28... so lower production than I expected at higher cost.
Promisingly, January DM production was much better at 11 g/t resulting in 6,000 oz for the month. This works out to be about half the processing capacity of the expanded plant. So find enough quality ore at Daisy East, Emma and Rosemary, and the potential production is 12,000 oz per month from UG ore... assuming the 11 g/t grade can be maintained.
So far Daisy East is looking excellent.
Rowingboat
- Forums
- ASX - By Stock
- Ann: Quarterly Activities Report
DM production grade of only 6.5 g/t due to poorer grades in the...
-
-
- There are more pages in this discussion • 176 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
KAI
Pilbara Minerals buys land off Kairos part of its York gold project for $20M – and a 2% royalty on any PLS gold sales
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares