57.4 tonnes ready to sell during Sept Qtr.
"Plant throughput more than doubled".
"At the end of the quarter, there were five rigs on site. Two additional rigs are planned for arrival on site by the end of July 2011".
Those drill rigs should provide for a steady stream of information.
I am sure Vale will be watching with interest.