* An infill drilling program (51 holes; 3,753 metres) in the Manuka and Boundary pit areas was completed in April. A 20m x 20m grade control drilling program (188 holes, 6,514m) on Manuka Pit was commenced and will be completed in August. A sterilisation drilling program in the proposed processing plant area intersected a number of high grade silver intercepts. The processing plant has been moved to accommodate this new mineralised area.
CCU Price at posting:
92.7¢ Sentiment: Hold Disclosure: Held