VAU 2.53% 38.5¢ vault minerals limited

Rabbit, it wasnt a stuff up in equipment - just procedure.The...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 1,870 Posts.
    lightbulb Created with Sketch. 141
    Rabbit, it wasnt a stuff up in equipment - just procedure.

    The current power station you refer to is rated at 6Mw, with 3 engines. The 'max' site demand is 8Mw. The installed power station delivers 4Mw from the 2 engines. You cant run all three as the third is a backup to account for maintenance and standby events. So the difference (4Mw) is sourced from the grid, when it is required (as 8Mw is max load).

    I am not saying this will eventuate with RED, but most of the other operators in the region are suffering voltage issues/and or difficulty sourcing the required current. Something has to give. Either the govt invests in infrastructure, the locals stop using energy at peak times, or mine operators develop their own infrastructure.
 
watchlist Created with Sketch. Add VAU (ASX) to my watchlist
(20min delay)
Last
38.5¢
Change
-0.010(2.53%)
Mkt cap ! $2.618B
Open High Low Value Volume
38.5¢ 39.0¢ 37.8¢ $4.729M 12.34M

Buyers (Bids)

No. Vol. Price($)
10 487571 38.0¢
 

Sellers (Offers)

Price($) Vol. No.
38.5¢ 29916 1
View Market Depth
Last trade - 16.10pm 01/11/2024 (20 minute delay) ?
VAU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.