CCU cobar consolidated resources limited

"Notes 1. The tonnes, grade and recovery of ore processed do not...

  1. 1,015 Posts.
    lightbulb Created with Sketch. 189
    "
    Notes
    1. The tonnes, grade and recovery of ore processed do not reconcile with silver produced due to the build-up of in-circuit stocks.
    These stocks include;
    - approximately 41,000 tonnes of oversize material at 91g/t silver and
    - 36,000 oz of silver produced in December which was not smelted and was contained in concentrate
    "

    So the actual silver produced came from only 177k - 41k = 136k tonnes of ore.

    There are 36k oz in circuit, so assuming it is all from this qtr 277k + 36k = 313k oz

    313k oz / 136 k tonnes = 2.3 troy oz per tonne = 71.5g/t on average. As you say, bad grades in Oct/Nov have something to do with it
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.