he says two statements in this announcement that suggest to me the designing is done and they are into the installation part which i presume would include physical construction of the components
NEW STATEMENT(page 1 point 2) - An engineering solution has been identified and is being installed
and
OLD STATEMENT re-used in this announcement as well in different context(page 2 paragraph 8) - While an engineering solution is being designed and implemented the Concentrator will continue to operate,
GBG Price at posting:
13.7¢ Sentiment: LT Buy Disclosure: Held