On July 31th Dragon has finally informed about the total failure of
Kuusamo EIA published by the authority on June 5th and
Finnish media after that. Actually it was the first EIA ever failed totally in Finland.
They talk about water measurements and it means lots of work
neglected in the first EIA.
http://hotcopper.com.au/threads/dragons-kuusamo-eia-failed-month-ago.2313570/
They say that engineering is needed and it would take 12-18 months.
The engineering plans were considered very poor by people and authority
and crushed by mining professor Kari Heiskanen
http://hotcopper.com.au/threads/mining-professor-statement-about-eia.2322592/
They do not tell that the delay would be years as local manager moving away from Kuusamo
about 1.5 weeks ago. It was discussed by local news that at least two summers would de needed
for environmental measurements.
They do not speak about the heavy and resistance of the city and people, which is likely to
stop the project anyway.
http://hotcopper.com.au/threads/dragon-bangs-head-against-wall-in-kuusamo.2321007/
And Swedish mine is empty and Finnish mine is operating with cash cost often higher
than market price of gold...
- Forums
- ASX - By Stock
- DRA
- Ann: Quarterly Activities Report
Ann: Quarterly Activities Report, page-2
-
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DRA (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.83 |
Change
-0.210(10.3%) |
Mkt cap ! $101.4M |
Open | High | Low | Value | Volume |
$1.93 | $1.93 | $1.83 | $64.48K | 33.51K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | $1.82 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.93 | 848 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | 1.815 |
1 | 525 | 1.810 |
2 | 1106 | 1.800 |
1 | 3000 | 0.980 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
1.925 | 848 | 1 |
2.000 | 18500 | 1 |
2.040 | 5116 | 2 |
2.050 | 11500 | 1 |
2.100 | 6460 | 1 |
Last trade - 11.54am 18/10/2024 (20 minute delay) ? |
Featured News
DRA (ASX) Chart |