RED 8.90% 33.3¢ red 5 limited

Below an extract from my post dated 6/6/2015; Hmmmm; still more...

  1. 1,327 Posts.
    lightbulb Created with Sketch. 9
    Below an extract from my post dated 6/6/2015; Hmmmm; still more to this story!!!

    Majorly disturbing is undoing dewatering-is the biggest sin; it is the biggest sin because re-saturation of the walls can have devastating consequences as shown by major wall collapse events in the ref below.
    Now I am not saying a major wall collapse event has occurred or will occur at the Siana pit; but the fact that it will take 6-9 months to clean the pit up "as a result of deterioration during the C & M period" is disturbing, images of the pit floor under water in late 2014 early 2015 is disturbing, rehabilitation of bore pumps is disturbing (see re-saturation comment), a wall-depressurisation consultant to be engaged & the latest quarterly announcement is a complete 1st principal review; hydrogeology, geotechnical, open pit resource & evaluation of underground.

    My gut feeling is there is possibly more to the pit story; I keep harping on full disclosure rules as stated in the Aust Corp Act 2001.

    http://www.austwaterenv.com.au/uplo...nd Depressurisation (Jon Hall - AIG 2014).pdf
 
watchlist Created with Sketch. Add RED (ASX) to my watchlist
(20min delay)
Last
33.3¢
Change
-0.033(8.90%)
Mkt cap ! $2.244B
Open High Low Value Volume
34.0¢ 34.5¢ 32.0¢ $7.108M 21.13M

Buyers (Bids)

No. Vol. Price($)
37 805153 33.0¢
 

Sellers (Offers)

Price($) Vol. No.
33.5¢ 429010 31
View Market Depth
Last trade - 10.45am 29/08/2024 (20 minute delay) ?
RED (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.