Anyone done some numbers?
A total of 125 wet tonnes of ore was processed
at an average grade of 30.9 grams per processed tonne of ore.
Based on aim of processing throughput of 40 to 60 tonnes per day
125 wet tonnes = 2 to 3 days processing
Production for the period 1 April to 30 June, 2017 was 3853g (123.9 ounces)
total sales of AUD$ 201,930
Plus the further ramp up of equipment-
up to three larger,secondhand bulldozers, a 40 tonne,
secondhand articulated tip truck and at least one new excavator.
Along with final commissioning of all-
The new roller crusher is the next item scheduled for installation,
and following the installation and commissioning
of all the new processing plant and equipment
Very good to see the excellent potential still on the near horizon
FID
Expand
I haven't had a chance to go through it yet FID but am pretty keen to run some numbers maybe over the weekend. The average grade is obviously exceptional though isn't it.