NTL 17.7% 2.0¢ new talisman gold mines limited

Ann: Quarterly Activities Report, page-2

  1. 10,577 Posts.
    lightbulb Created with Sketch. 834
    Nice item's of Note in the Scoping Study

    Scoping Study
    Mine design and production Figure 3 - View from the portal during installation of the air lock structure scheduling covering the much larger, 469,000 Oz AuEq mineral resource, is likely to point towards a significantly larger, longer life operation than has previously been considered. It is equally likely that, considering the increased grade of the recently upgraded mineral resource (6.6g/t AuEq vs 15.1 g/t AuEq), that economic prospects for the project will increase significantly.​
 
watchlist Created with Sketch. Add NTL (ASX) to my watchlist
(20min delay)
Last
2.0¢
Change
0.003(17.7%)
Mkt cap ! $8.831M
Open High Low Value Volume
1.7¢ 2.0¢ 1.7¢ $1.993K 107.4K

Buyers (Bids)

No. Vol. Price($)
1 97710 1.9¢
 

Sellers (Offers)

Price($) Vol. No.
2.0¢ 1703375 7
View Market Depth
Last trade - 16.10pm 03/05/2024 (20 minute delay) ?
Last
2.0¢
  Change
0.003 ( 0.00 %)
Open High Low Volume
2.0¢ 2.0¢ 2.0¢ 50000
Last updated 13.02pm 03/05/2024 ?
NTL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.